Trades & Workshops · Low risk
Rainwater harvesting installation: how to start it in Ghana
Install gutters, downpipes, filters and storage tanks that collect rainwater for homes, schools, churches and farms.
What is this business?
You design and install rainwater harvesting systems: roof gutters, downpipes, first-flush diverters, filters and storage tanks, underground or above ground, with pumps where needed. You also clean and repair gutters and tanks. Customers include home owners, schools, churches, clinics and farms.
Why it works in Ghana
Many Ghanaian towns have irregular water supply, and buying tanker water is expensive. A rainwater system cuts water bills and gives water when the taps run dry. Schools, churches and farms with big roofs can collect a lot of water, and NGOs fund systems in communities.
What you need to start
You need practical plumbing and roofing skills, tools such as drills, cutters, levels and a sturdy ladder, a safety harness, and suppliers of gutters, pipes, filters and tanks. Learn to size gutters and tanks for each roof and rainfall.
Startup costs
| Tools: drill, cutters, levels and ladder | ₵1,500–5,000+ |
| Starter gutters, pipes, diverters and filters | ₵2,000–8,000+ |
| Transport (optional) | ₵0–15,000+ |
| Workshop or store | ₵500–3,000+ |
| Marketing | ₵300–1,000+ |
| Typical total to start | ₵4,300–32,000+ |
The money, month by month
| Installations: ~4–15 × ₵1,500–5,000+ | ₵6,000–75,000+ |
| Maintenance and cleaning | ₵500–4,000+ |
| Materials | −₵2,500–35,000+ |
| Helpers | −₵800–6,000+ |
| Transport | −₵300–2,500+ |
| Marketing | −₵200–1,000+ |
| Other costs and slow-period allowance | −₵900–9,500+ |
| Net profit per month | ₵1,800–25,000+ |
Who buys
- Home owners and landlords
- Schools, churches and clinics
- Farms and NGOs
Risks and what to do
- Falls. Roof work is dangerous. Use a harness and a sound ladder.
- Leaks and poor slopes. Badly fitted gutters overflow. Check slopes and joints.
- Dirty water. Without a first-flush and filter, the first rain carries dirt into the tank. Always fit them.
- Seasonal demand. Most work comes before the rains. Plan and book early.
Ways to grow
- Serve schools, churches and clinics. Large roofs mean bigger systems.
- Partner with NGOs. Community water projects need installers.
- Offer maintenance plans. Cleaning gutters and tanks before the rains.